Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

AIRPORT WAY and JOHANSEN EXPRESSWAY, LED LIGHTING REPLACEMENT ROAD CONSTRUCTION through the season
What You Need to Know
  • Crews will be working during the day and at night on the shoulders of Airport Way and the Johansen Expressway to update the roadway lighting system.
  • Drivers should expect LANE CLOSURES.
  • Please watch for equipment accessing the light fixtures, especially at night.
Project End Result

The Alaska Department of Transportation, in cooperation with B & B Electric, Inc., is working to update the lighting on Airport Way and the Johansen Expressway. Upon completion of the work, drivers will notice improved lighting along these routes. The State will also realize a sizable cost savings due to reduced energy usage.

Contractor Information

B & B Electric, Inc.

Contractor Number
907-456-3225
DOT Number
907-451-2200

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers