AMATS: ANCHORAGE AREA WIDE TRAILS REHABILITATION, FISH CREEK TRAIL ROAD CONSTRUCTION through December
What You Need to Know
  • Construction will continue into December.
  • Portions of the Fish Creek Trail will be CLOSED between Red Bridge Park and Barbara Street Park during construction.
  • Segments of the trail will be CLOSED to pedestrian and bicycle traffic. Access to Fish Creek Park, Woodland Park, and Barbara Street Park will be maintained.
  • Please be aware that construction vehicles will be entering and exiting the pathway.
Project End Result

The Alaska Department of Transportation, in partnership with Neeser Construction, Inc., is working to reconstruct Fish Creek Trail from Red Bridge Park to Taft Street and from Fish Creek Park to Barbara Street Park. Project work includes installing new pavement, four new bridges, and new lighting throughout the project. This project is expected to be completed in spring 2019.

Contractor Information

Neeser Construction, Inc.

Contractor Number
907-276-1058
DOT Number
907-770-0457

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers