Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

DOWLING ROAD, OLD SEWARD HIGHWAY to LAKE OTIS PARKWAY PAVEMENT PRESERVATION ROAD CONSTRUCTION through October
What You Need to Know
  • Be alert to daily LANE CLOSURES and DELAYS from 9:00am to 3:30pm and from 8:00pm to 5:30am along Dowling Road and its roundabouts. 

 

 

Traffic Impacts

Work will occur during the day and at night. There will be LANE RESTRICTIONS and LANE CLOSURES as well as sidewalk CLOSURES and DETOURS due to curb ramp work. The roundabouts at Dowling Road and the Seward Highway will be completely CLOSED (including the ramps) two separate weekends, from Friday evening till late Sunday evening. More specific dates will be shared as soon as available. 

Project End Result

The Alaska Department of Transportation, in cooperation with GMG General, Inc., is working to preserve pavement on Dowling Road from the Old Seward Highway to Lake Otis Parkway. Upon completion, Dowling Road will have new pavement as well as upgraded curb ramps. This project is expected to be complete in October 2017.

Contractor Information

GMG General, Inc.

Contractor Number
349-7854
DOT Number
770-0457

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers