Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

ELLIOTT HIGHWAY MP 0 to 12 REHABILITATION & MP 20 CUSHMAN CREEK CULVERT REPLACEMENT ROAD CONSTRUCTION through the season
What You Need to Know
  • Work is expected to start in May.
  • Please expect work at the Chatanika River Bridge.
  • Periodic work at Fox Spring Wayside.
  • Shoulder work in the vicinity of Fox Intersection.
  • Additional road work at MP 20.
Traffic Impacts

Expect flagging and PILOT CAR operations and up to 20 minute DELAYS.

Project End Result

The Alaska Department of Transportation is working to rehabilitate the Elliott Highway from Fox to Haystack. Work will include rehabilitating roadway, repairs to roadside hardware, shoulder, and bridge work as well as drainage improvements and lighting upgrades. We will do our best to keep you informed of any project updates and appreciate your patience and cooperation during construction. Work for this project is expected to be complete by October 2019.

DOT Number
907-451-3037

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers