HSIP: PHILLIPS FIELD ROAD, SAFETY IMPROVEMENTS ROAD CONSTRUCTION through October
Road Closure

Phillips Field Road is expected to be CLOSED to all traffic in early May 2018. Please plan to follow posted DETOUR signs for pedestrian and vehicle traffic. 

What You Need to Know
  • Construction crews are expected to begin work on this project the week of May 5th.
  • Safety improvements will include straightening and widening the alignment of Phillips Field Road between Fox Avenue and Driveway Street.
  • Crews will also be constructing a retaining wall along the Chena River.
Project End Result

 The Alaska Department of Transportation, in partnership with HC Contractors, is working to construct safety improvements on Phillips Field Road from Jack Lindsey Lane to Driveway Street. This will include shoulder widening, minor road realignment, building a retaining wall and utility relocations. 

Contractor Information

HC Contractors, Inc

Contractor Number
(907) 978-3051
Public Files

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers