Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

RICHARDSON HIGHWAY, BEAR CREEK BRIDGE MP 126 ROAD CONSTRUCTION through July
What You Need to Know
  • Construction crews are working on foundation drilling to support bridge construction.
  • Drivers should expect a SINGLE-LANE CLOSURE with flagging operations from 8:00am to 6:00pm, Monday through Sunday.
Traffic Impacts

Drivers should be aware of 5 minute DELAYS. Please drive with caution and be aware of construction crews working in the roadway.

Project End Result

The Alaska Department of Transportation will be performing foundation drilling for a new bridge at Bear Creek Bridge MP 126. 

Contractor Information

DOT Statewide Materials

Contractor Number
907-269-6235
DOT Number
907-269-6235
DOT Hotline
511

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers