RICHARDSON HIGHWAY MP 80 to 82 RESURFACING AND DRAINAGE IMPROVEMENTS ROAD CONSTRUCTION through August
What You Need to Know
  • This project is complete.
Project End Result

The Department of Transportation and Public Facilities, in cooperation with Harris Sand & Gravel, is working to improve the Richardson Highway from MP 80 to 82. Work will include resurfacing the roadway, as well as installing a drainage system, signing, and pavement markings. The project is expected to be complete by August 2018.

Contractor Information

Harris Sand & Gravel

Contractor Number
907-835-4756
DOT Number
907-822-5953

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling