Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

SEWARD CITYWIDE ROAD IMPROVEMENTS ROAD CONSTRUCTION through late the season
What You Need to Know
  • Be alert to LANE RESTRICTIONS and DELAYS within Seward city limits over the course of the season as road improvement projects begin. Please check back for updates periodically as various projects change locations.
Traffic Impacts

Project will include road improvements to within the City of Seward. Be alert to the following areas over the course of the season and check back for updates.

First Avenue, Fifth Avenue, Sixth Avenue, Washington Street, Adams Street, Jefferson Street, Madison Street, Monroe Sreet, A Street, C Street, Dora Way, Phoenix Road, Resurrection Boulevard, Marathon Drive, Bear Drive, Benson Drive, Coolidge Drive, Oak Street and Ash street.

Project End Result

The Alaska Department of Transportation, in partnership with Knik Construction, is working to improve road conditions within the City of Seward. Project work includes paving and updating curb ramps for ADA compliance. This project is scheduled to be complete by October 31, 2017.

DOT Number
907-522-5055

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers