SKAGWAY: CAPTAIN WILLIAM HENRY MOORE BRIDGE REPLACEMENT, KLONDIKE HIGHWAY MP 11 to 13 ROAD CONSTRUCTION through the season
What You Need to Know
  • This project has been shut down for the winter. Construction will resume in the spring.
Project End Result

The Alaska Department of Transportation, in cooperation with Hamilton Construction, LLC, is working to replace the Captain William Henry Moore Bridge on the Klondike Highway near Skagway. Upon completion, a roller-compacted concrete (RCC) structure will carry traffic over William Moore Creek and replace the aging bridge. Rock excavation required for the RCC structure will allow the State to straighten the roadway and build a new wayside parking lot south of the bridge. There will be no future access across the old bridge, but the structure will remain in place as a testament to the ingenuity and hardwork of the Klondike Highway pioneers. This project is expected to be complete by the end of August 2018. This project will shutdown due to seasonal weather restrictions in the fall of 2017. Construction will resume after the spring thaw in 2018. 

Contractor Information

Hamilton Construction, LLC

Contractor Number
907-232-4119
DOT Hotline
(907)983-2014

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers