Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

SR HIGHWAY DATA EQUIPMENT ACQUISITION and INSTALLATION, N. POINT HIGGINS, N. TONGASS HIGHWAY, and REVILLA ROAD REHABILITATION ROAD CONSTRUCTION through October
What You Need to Know
  • From Wednesday, September 25, until Monday, September 30, crews will be working at North Tongass Highway, Revilla Road, and North Point Higgins Road for the installation of underground loops, piezo and road repaving operations.
  • Drivers should expect a SINGLE LANE CLOSURE with flagging operations.
  • Drivers should also expect DELAYS.
  • Please be aware of workers and equipment in and near the road, and use extreme caution when traveling through the work zone.
  • For questions, please call Island Electric at 907-780-2280 or 907-321-1369.
Contractor Information

Island Electric

Contractor Number
907-321-1369

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers