STERLING HIGHWAY BELUGA LAKE DAM IMPROVEMENTS ROAD CONSTRUCTION through mid July
What You Need to Know
  • The area of impact for this construction is approximately a 1/2 mile, with guard rails on both sides of the highway.
Traffic Impacts

Traffic lanes will be redirected between the guardrails to allow equipment to work on either side of the Sterling Highway. Construction will happen on one side of the road at a time, allowing the maximum amount of driving surface. Please slow down and drive with caution. 

Project End Result

The Alaska Department of Transportation, in partnership with Jay-Brant General Contractors LLC, is working to replace the Beluga Lake Dam. Work will include lining the existing culverts in place. Levels of Beluga Lake will be maintained to ensure floatplanes can continue to utilize the lake as well as ensure no flooding will occur in the area.

Contractor Information

Jay-Brant General Contractors LLC

Contractor Number
907-235-8400 Ext 116
DOT Number
907-744-7609

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers