WRG: BENNETT STREET AND AIRPORT ROAD PAVEMENT RESURFACING ROAD CONSTRUCTION through September
What You Need to Know
  • Construction crews are working on Bennett Street and Airport Road, from the Bennett Street and Zimovia Highway intersection, to Evergreen Avenue.
  • Crews are working from 7:00am to 5:00pm, Monday through Saturday.
  • Drivers should expect ONE-LANE TRAFFIC, with flagging operations and DELAYS.
  • Please follow all posted signs and watch for crews in the area and construction vehicles entering the roadway.
Project End Result

The Alaska Department Of Transportation, in cooperation with SECON Construction, is working to resurface Bennett Street and Airport Road, and a short section of Evergreen Avenue. Work will include upgrading existing culverts and drainage structures, as well as installing ADA improvements, lighting, signage and striping. Crews will also be working on minor structural section improvements. Work is expected to be complete in September 2019.

Contractor Information

SECON Construction

Contractor Number
907-874-3145
DOT Number
907-874-3140

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers