Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

22. HSIP: SEWARD HIGHWAY ROCKFALL MITIGATION ROAD CONSTRUCTION through the season
What You Need to Know
  • A concrete barrier is placed along the centerline of the Seward Highway between MP 110.5 and 111. Please use caution while driving through the project area. 
  • Drivers should expect long DELAYS and flagging operations at MP 110.5, from Monday through Friday between 8:00am and 7:00pm, as well as on Saturday between 7:00am and 7:00pm.
Project End Result

The Alaska Department of Transportation, in cooperation with Hi-Tech Rockfall Construction Inc., is performing stabilization work to mitigate rockfall sites along the Seward Highway between Anchorage and Girdwood. Construction for 2020 is expected to continue until the end of October, and work is expect to resume in April 2021.

Contractor Information

Hi-Tech Rockfall Construction Inc.

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers