Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

ALASKA HIGHWAY PASSING LANES, MP 1280 to 1300 ROAD CONSTRUCTION through the season
What You Need to Know
  • Crews are performing paving operations. This work is weather dependent. Drivers should be alert to PILOT CAR operations and DELAYS from MP 1285 to 1286 and from MP 1295 to 1297.
  • Drivers should be alert to truck crossings at MP 1276 and 1281.
  • Drivers should expect crews working from 7:00am to 7:00pm, Monday through Sunday, as well as into the evening.
Project End Result

The Alaska Department of Transportation, in cooperation with HC Contractors, is working to upgrade the Alaska Highway by adding additional passing lanes to provide drivers with more opportunities to safely pass vehicles. This project will be conducted in two work zones. Project work includes adding a passing lane in each direction, replacing culverts, and repaving the road surface.

Contractor Information

HC Contractors

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers