Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

AMATS: CHUGACH FOOTHILLS CONNECTOR, PHASE II ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should expect crews working adjacent to the roadway throughout the season.
  • Drivers should be alert to eastbound LANE RESTRICTIONS and flagging operations on Tudor Road between Regal Mountain Drive and Campbell Airstrip Road.
  • Drivers should be alert for trucks entering and exiting the roadway.
  • Access to businesses will remain open throughout construction.
Project End Result

The Alaska Department of Transportation, in cooperation with Neeser Construction, Inc., will construct a multi-use path along Tudor Road between Regal Mountain Drive and Campbell Airstrip Road. Project work will include grading, pathway, boardwalk, and signage. Work is anticipated to be complete by July 1, 2023.

Contractor Information

Neeser Construction, LLC

Contractor Number
907-244-3368
Project Area
19

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers