Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

AMATS: MOUNTAIN VIEW DRIVE, PATHWAY RECONSTRUCTION ROAD CONSTRUCTION through December
What You Need to Know
  • Crews will continue working in June to complete landscaping, tree planting, and remaining work at the Louie G. Mizelle Park and at the intersection of Mountain View Drive and North Bliss Street. 
  • Please follow all of the construction signs and traffic devices to access businesses during construction.
Project End Result

The Alaska Department of Transportation, in cooperation with Mass Excavation, Inc., is constructing a multi-use pathway along the north side of Mountain View Drive between North Bunn Street and North Bliss Street.  The project will also realign the existing pathway located within Louis G. Mizelle Park. 

Contractor Information

Mass Excavation, Inc.

Contractor Number
907-771-9272
DOT Number
907-269-0450
Project Area
22

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers