Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

AMATS: REEVE BOULEVARD, 5TH AVENUE to POST ROAD, PAVEMENT PRESERVATION ROAD CONSTRUCTION through the season
What You Need to Know
  • This project is in winter shutdown. Work is expected to resume in spring 2023.
Project End Result

The Alaska Department of Transportation, in cooperation with Granite Construction, is working to remove and replace the pavement on Reeve Boulevard from 5th Avenue to Post Road. Work will include installing drainage, paving, signal modification and curb ramps, as well as signage and striping. This project is expected to be complete in September 2022.

Contractor Information

Granite Construction

Contractor Number
907-267-5230
DOT Number
907-538-5678

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers