ANCHORAGE DISTRICT, GROUP A - NOV 2018 EQ PR: BIRCHWOOD LOOP ROAD SOUTH ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should expect daily LANE RESTRICTIONS and flagging operations.
  • Drivers should be alert to workers and equipment in the roadway.
Project End Result

The Alaska Department of Transportation, in cooperation with Granite Construction, is working to make repairs due to damage from the November 2018 earthquake. Crews will be replacing an existing 48-inch pipe and associated headwalls with a 90-inch pipe. Once installed, crews will be paving the roadway and installing a new guardrail. This project is expected to be complete in October 2021.

Contractor Information

Granite Construction

Contractor Number
907-344-2593
Project Area
5

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers