Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

DILLINGHAM DOWNTOWN STREETS REHABILITATION ROAD CONSTRUCTION through late August
What You Need to Know
  • All work this season has been completed. 
  • Work is expected to resume in May 2021. Crews will be performing utility work, road reconstruction and paving, and curb/gutter/sidewalk work.
Project End Result

The Alaska Department of Transportation, in cooperation with JJC Enterprises, is working to realign and rehabilitate three streets forming a loop within the downtown area of Dillingham. The project area includes Main Street, D Street, and 2nd Avenue. Work will include a complete reconstruction of the roads, new sidewalks and pathways around the loop, and a new storm drain system. The remaining work, including road work, utility relocation, and installation, will be completed in 2021.

Contractor Information

JJC Enterprises

DOT Number
907-842-2997
DOT Hotline
907-842-2647

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers