Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

HSIP: ANCHORAGE PEDESTRIAN LIGHTING, PHASE I ROAD CONSTRUCTION through the season
What You Need to Know
  • This project is in winter shutdown. Work is expected to resume in spring 2023.
Project End Result

The Alaska Department of Transportation, in cooperation with CCI Electrical Service LLC, is working to improve lighting on three corridors in Anchorage ranked highest for pedestrian crashes in Alaska. The corridors include Tudor Road between Lake Otis Parkway and Piper Street, Muldoon Road between Debarr Road and Old Harbor Avenue, and the Seward Highway between Northern Lights Boulevard and Benson Boulevard. Project work includes installing paving, drainage, ADA facilities, illumination, signalization, signing, and striping.

Contractor Information

CCI Electrical Services LLC

Contractor Number
907-987-3559

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers