Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

MCCARTHY ROAD, MP 27 CHOKOSNA RIVER BRIDGE #1193 REPLACEMENT ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should be aware of a ONE-LANE ROAD extending past the bridge.
  • Drivers should be alert to large trucks hauling material on McCarthy Road. 
  • Drivers should expect reduced speeds and heavy equipment in the area.
  • Drivers should also expect minor DELAYS.
Project End Result

The Alaska Department of Transportation, in cooperation with HC Contractors, is working to construct a new bridge over the Chokosna River and a new road alignment to access the bridge.

Contractor Information

HC Contractors

DOT Number
907-987-0524

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers