PARKS HIGHWAY MP 48.8 to 52.3 RECONSTRUCTION ROAD CONSTRUCTION through the season
What You Need to Know
  • Drivers should be aware of flagging operations and trucks crossing onto the Parks Highway between Spring Drive and Marigold Drive.
  • Be alert to flagging operations at the Parks Highway and Pittman Road intersection Monday through Saturday, from 7:00am to 6:00pm.
  • Please be alert to workers and equipment along the shoulder of the roadway.
Project End Result

The Alaska Department of Transportation, in cooperation with QAP, is upgrading the existing two-lane highway to a four-lane divided highway. Crews will be installing continuous highway lighting, new signs, and guardrail. There will be signalized intersections at Parks Highway and Meadow Lakes Loop, Parks Highway and Johnson Road, and Parks Highway and Big Lake Road. A multi-use pathway will also be constructed along the entire length of the corridor.

Contractor Information

QAP

DOT Hotline
907-373-0061
Project Area
2

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers