Skip to main content

map

map

LEGEND:

Project Marker Project

Project With Road Closure Project with

       ROAD CLOSURE

RICHARDSON HIGHWAY, MP 82 to 97 RESURFACING ROAD CONSTRUCTION through the season
What You Need to Know
  • Through Sunday, June 27, from 6:00am to 9:00pm daily, crews will be working to clear trees, remove pavement, excavate, and install culverts.
  • Please be alert to flying debris, equipment, and workers on the roadway. 
  • Drivers should expect changing road surfaces, flagging and PILOT CAR operations, as well as DELAYS.
Project End Result

The Alaska Department of Transportation, in cooperation with HC Contractors, is working to resurface the Richardson Highway from MP 82 to 97.

Contractor Information

HC Contractors

Contractor Number
907-488-5983
DOT Number
907-451-3037

Special Accommodations Contact:

Those people who reside in construction zones and may require special accommodations should call the DOT Highway Construction Engineer at 907-269-0450 (TTY 907-269-0473).

Safety in all construction zones:

  • Traffic fines are double
  • Watch for changing driving surfaces
  • Watch for reduced speed limits
  • Be alert to and follow directions of flaggers
  • Drive with headlights on
  • Allow additional time when traveling
  • Watch for equipment and workers